https://www.avient.com/sites/default/files/2020-07/onflex-lo-hvac-flap-spanish.pdf
OnFlex LO - HVAC Flap - Spanish
PROVEEDOR TIER 2
R E J I L L A P A R A S I S T E M A S D E
V E N T I L A C I Ó N Y
C A L E F A C C I Ó N
• Eliminar el post-calentamiento de las piezas a fin de lograr
el nivel de olor necesario (≤3.0 VDA 270)
• Tener la menor emisión de compuestos orgánicos volátiles
(VOC/FOG) (VDA 278), con el mismo compresión set del
material anterior
• Menos pasos de procesamiento y menores
costos de energía para el moldeador
• Se lograron los niveles VOC/FOG
requeridos y se cumplió el desempeño con
el estándar de compresión set
OnFlex™ LO
REQUERIMIENTOS CLAVE
¿POR QUÉ AVIENT?
https://www.avient.com/sites/default/files/2025-06/ColorMatrix Joule Tech Bulletin.pdf
Such advice, for example how to set up blow
molding machines, is not equipment specific and
therefore ColorMatrix would always recommend
using local or expert technicians in addition to
following best practice points listed below;
• Preforms should be conditioned for minimum
24 hours prior to blowing
• Preforms should always be used in a FIFO
manner (First In, First Out)
• Octabins of preforms should be segregated and
blown per resin type, i.e. not mixed with other
resins
• A preform traceability system should be in
place such that any process upsets can be
quickly followed up and corrected
• Enhanced QC preform checking resources
for bottle distribution, aesthetics and integrity
should be on-hand during the performance
optimization trials
• Prior to any process optimization, the blowing
machine performance should be verified as
being within normal i.e. accepted standard
ranges and all important components and
control features are working satisfactorily.
Maximum speed output should be attainable
prior to any ‘recipe’ setting trials
Copyright © 2020, Avient Corporation.
CAUSE AND EFFECT DIAGRAM
Methods Machines
Materials Manpower
energy
saving
during
SBM
Maintenance
instructions
Operating
instructions
Operator
Job spec
NIR Lamps
SBM
Type/Design
vPET reheat
content
vPET
formulation
rPET
blend/quality
Temperature
recording
Temperature
measurement
probe
External
temperature
Inappropriate
Manual
Training
New
Alignment
Same
Throughput
Too many tasks
Time conflict
Age/intensity
variable
Set up conditions
Configuration
- When starting to process a new resin, first
run through new preforms for 15 minutes at
‘standard’ conditions to establish steady state
conditions prior to any process optimization
- Slowly start to reduce preform blowing
temperatures until failures are present
(visible pearl internal wall or pearl feet)
- Increase blowing temperatures until defects
are eliminated
- QC check bottle quality for acceptance versus
established tolerances
- Change the power consumption profile in the
ovens for early heat and longer sink times but
ensure overall temperatures do not exceed cold
crystallization temperature
- Repeat temperature reduction stage and
then defect elimination stage to test if further
optimization is possible
- Recheck QC bottle quality for acceptance versus
established tolerances
- Log all process parameters and create new
specific ‘recipe’ for future use
https://www.avient.com/sites/default/files/2022-05/Avient_ALL_Policies_2022_0.pdf
Setting and periodically
reviewing environmental objectives and targets assures excellence in
environmental leadership.
Avient strives to be the industry leader in safety and health by setting aggressive
goals, measuring performance, and making necessary adjustments.
Setting goals and objectives that drive continual improvement and check
effectiveness of risk reduction measures in product safety and
stewardship
https://www.avient.com/sites/default/files/2022-02/Sustainability ESG Disclosures_Titanium Dioxide.pdf
The substance is
used in powdered form in industrial settings only.
EXPOSURE
HUMAN HEALTH SAFETY ASSESSMENT
Human Health
The substance is used in industrial settings only.
Uses in industrial settings are generally under
controlledconditions and often in closed system.
https://www.avient.com/sites/default/files/2021-05/avient-responsible-care-ehs-s-policies-2021.pdf
Setting and periodically reviewing
environmental objectives and targets assures excellence in
environmental leadership.
Avient will be the leader in safety and health by setting aggressive goals,
measuring performance, and making adjustments when necessary.
Setting goals and objectives that drive continual improvement and
check effectiveness of risk reduction measures in product safety
and stewardship
https://www.avient.com/sites/default/files/2023-08/QRG for suppliers on CSP order management%5B87%5D.pdf
With a custom view you can create a set of advanced search filters.
1.
You can use the following settings when creating or editing a custom view for a CSP table.
4.
Once complete, save your settings.
https://www.avient.com/sites/default/files/2025-06/IATF16949 -2025.5.21~2028.5.20 EN -EM.pdf
IATF Certificate
Place and date: For the issuing office:
Katy, TX, 22 May 2025
Revision 10
DNV - Business Assurance
1400 Ravello Drive, Katy, TX, 77449-
5164, USA
Sherif Mekkawy
Management Representative
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
ACCREDITED UNIT: DNV Business Assurance USA Inc., 1400 Ravello Drive, Katy, TX, 77449-5164, USA - TEL: +1 281-396-1000. www.dnv.com
Page 1 of 2
MANAGEMENT SYSTEM
CERTIFICATE
Certificate no.:
11229-2006-CHN-IATF
IATF Certificate No:
0573810
Valid:
21 May 2025 – 20 May 2028
This is to certify that the management system of
PolyOne - Suzhou, China
EM Sector, 77 Shenggang Street, Suzhou Industrial Park, Suzhou, Jiangsu, China 215024 (USI:
CF4943)
and, if applicable, the remote supporting locations as mentioned in the Appendix accompanying
this Certificate
has been found to conform to the Quality Management System standard:
IATF 16949:2016
This certificate is valid for the following scope:
DESIGN AND MANUFACTURE OF PLASTIC COMPOUNDING MATERIAL
EXCLUSION: NONE
http://www.dnv.com
Certificate no.: 11229-2006-CHN-IATF
IATF Certificate No: 0573810
Place and date: Katy, TX, 22 May 2025
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
https://www.avient.com/sites/default/files/resources/ISO9001.2015PolyOneShanghai%25282018-2021%2529.pdf
China
TEL: +86 21 32799000
Zhu Hai Ming
Management Representative
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
Park, Pudong, Shanghai, China, 201203
and the sites as mentioned in the appendix accompanying this certificate
has been found to conform to the Quality Management System standard:
ISO 9001:2015/GB/T 19001-2016
This certificate is valid for the following scope:
Design and Manufacture of Masterbatch
C ertificate No: 7071-1998-AQ-RGC-RvA
P lace and date: Shanghai, 30 March, 2018
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
https://www.avient.com/sites/default/files/2024-12/IATF16949 2016 Certificate for PolyOne shenzhen-EN2024.pdf
IATF Certificate
Place and date: For the issuing office:
Katy, TX, 10 December 2024
Revision 2
DNV - Business Assurance
1400 Ravello Drive, Katy, TX, 77449-
5164, USA
Sherif Mekkawy
Management Representative
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
No. 1, Qihang Industry Park, Haoxiang Road, Shajing Town, Baoan, Shenzhen, Guangdong,
China 518104 (USI: C5M65R)
and, if applicable, the remote supporting locations as mentioned in the Appendix accompanying
this Certificate
has been found to conform to the Quality Management System standard:
IATF 16949:2016
This certificate is valid for the following scope:
DESIGN AND MANUFACTURE OF PLASTIC COMPOUNDING MATERIAL
EXCLUSION: NONE
http://www.dnv.com
Certificate no.: 273138-2018-AQ-RGC-IATF
IATF Certificate No: 0558323
Place and date: Katy, TX, 10 December 2024
Lack of fulfilment of conditions as set out in the Certification Agreement may render this Certificate invalid.
https://www.avient.com/sites/default/files/2020-10/demystifing-cmf-brochure.pdf
STANDING APART
FROM THE
COMPETITION
HOW DO MY CMF CHOICES SET ME APART
FROM COMPETITORS?
Finding a color,
material and finish that catches the eye and sets you apart from
your competition is vital.
D E S I G N I L LU M I N AT E S
VISUALIZING
COLOR, MATERIAL
& FINISH SELECTION
WE’VE DEVELOPED A TOOL THAT
ALLOWS YOU TO SET THE CRITICAL
FACTORS FOR YOUR PROJECT,
ALLOWING YOU TO MAKE INTELLIGENT
CMF DECISIONS AND ACCELERATE
DEVELOPMENT.