https://www.avient.com/sites/default/files/2023-10/2023 Hammerhead Application _ Install Guide.pdf
GL
AS
S/
EP
OX
Y
TA
B
M
AT
ER
IA
L
N
O
T
AB
BREAK
Hammerhead with
5 lb/ft3 (80 kg/m3)
420 lbs
191 kg
Hammerhead with
7 lb/ft3 (115 kg/m3)
2 in
370 lbs
168 kg
Hammerhead with
8 lb/ft3 (135 kg/m3)
332 lbs
151 kg
984 lbs
446 kg
Glass/Polyester
with Balsa Core
1298 lbs
589 kg
Hammerhead with
5 lb/ft3 (80 kg/m3)
Core Density -
ITW Plexus
MA420 Adhesive
NA 501 lbs
227 kg
Hammerhead with
7 lb/ft3 (115 kg/m3)
Core Density -
ITW Plexus MA420
Adhesive
NA 839 lbs
381 kg
Hammerhead with
8 lb/ft3 (135 kg/m3)
Core Density -
ITW Plexus
MA420 Adhesive
NA 1156 lbs
524 kg
Hammerhead with
8 lb/ft3 (135 kg/m3)
Core Density -
Crestomer
1152PA Adhesive
NA 1530 lbs
694 kg
Hammerhead with
8 lb/in3 (135 kg/m3)
Core Density -
Crestomer
M1-30 Adhesive
NA 1471 lbs
667 kg
Mixed Conditions
ADHESIVE
DESCRIPTION
ADHESIVE
GRADE MANUFACTURER
AVERAGE
BOND
STANDARD
DEVIATION
FAILURE
MODE
BEST ADHESION
2k Urethane 75421 Lord 2281 psi
15.73 MPa
184 psi
1.27 MPa
Substrate
Cohesive
2k Acrylic SA1-705 GRY1 AccraLock 2211 psi
15.24 MPa
78 psi
0.54 MPa Substrate
2k Acrylic Plexus MA420 ITW 2171 psi
14.97 MPa
262 psi
1.81 MPa Substrate
2k Acrylic SA10-05 Blk1 AccraLock 2102 psi
14.49 MPa
138 psi
0.95 MPa Substrate
2k Urethane 75451 Lord 2047 psi
14.11 MPa
68 psi
0.47 MPa Cohesive
2k Acrylic SA1-705 GRY 1:2 AccraLock 1966 psi
13.56 MPa
68 psi
0.47 MPa Substrate
2k Acrylic Scotchweld 8010 3M 1907 psi
13.15 MPa
61 psi
0.42 MPa Adhesive
Cyanoacrylate Gorilla Glue Gorilla Glue 1885 psi
13.00 MPa
432 psi
2.98 MPa Cohesive
2k Acrylic Crestabond PP-04 Scott Bader 1873 psi
12.91 MPa
281 psi
1.94 MPa Substrate
2k Acrylic SA10-05 Blk 10:2 AccraLock 1779 psi
12.27 MPa
127 psi
0.88 MPa Cohesive
2k Urethane 75422 Lord 1716 psi
11.83 MPa
190 psi
1.31 MPa
Cohesive
Adhesive
2k Urethane 75452 Lord 1535 psi
10.58 MPa
98 psi
0.68 MPa Adhesive
2k Methacrylate Polyfuse Icon
Containment
1610 psi
11.10 MPa
98 psi
0.68 MPa Adhesive
INTERMEDIATE ADHESION
2k Acrylic FA10-05 Blk
C010817 AccraLock 724 psi
4.99 MPa
58 psi
0.40 MPa Cohesive
2k Acrylic FA10-05 Blk1 AccraLock 722 psi
4.98 MPa
44 psi
0.30 MPa Cohesive
2k Epoxy Loctite Epoxy
Instant Mix Loctite 508 psi
3.50 MPa
81 psi
0.56 MPa Adhesive
2k Epoxy Gorilla Glue Epoxy Gorilla Glue 341 psi
2.35 MPa
198 psi
1.37 MPa Adhesive
NOT RECOMMENDED
2k Epoxy Loctite Epoxy
Marine Loctite 0 0 No bond
ADHESIVE SELECTION
Brands identified are owned by the manufacturers of the adhesive products.
1 surface sanded with 220 grit scuff prep 2 surface primed with 459T
FASTENER TYPE BENEFITS CONSIDERATIONS
Through-Bolting Best mechanical
locking system
Need back side
access to panel
Screw-In Anchor Highest pullout
strength Requires pilot hole
Cup Washer Spreads
compressive load
Requires relief hole;
For substructure and
hard point attachment
Wide Grip
(Bulb-Style)
Rivet
Ease of use—no
installation torque
limitations
For lower
load attachments
Sheet Metal or
Wood Screw
Readily available,
low cost
Penetrate both skins
for improved pullout
Shoulder Washer Limits
compressive load
Requires relief hole;
For substructure and
hard point attachment
For more information on installation, adhesives, and fasteners
for specific applications, please contact Avient.
https://www.avient.com/sites/default/files/resources/PolyOne%2520IR%2520Presentation%2520-%2520RW%2520Baird%25202015%2520Industrial%2520Conference%2520-%2520November%25202015.pdf
Forward-looking statements give current expectations or forecasts of future events and are not
guarantees of future performance.
They use words such as “will,”
“anticipate,” “estimate,” “expect,” “project,” “intend,” “plan,” “believe,” and other words and terms of similar meaning in connection with any discussion of
future operating or financial performance and/or sales
Senior management uses operating income excluding special items, adjusted EPS, and working
capital to assess performance and allocate resources because senior management believes that these measures are useful in
understanding current profitability levels and that current levels may serve as a base for future performance.
https://www.avient.com/sites/default/files/resources/POL%2520IR%2520Presentation%2520-%2520Credit%2520Suisse%2520-%2520June%25202015.pdf
Forward-looking statements give current expectations or forecasts of future events and are not
guarantees of future performance.
They use words such as “will,”
“anticipate,” “estimate,” “expect,” “project,” “intend,” “plan,” “believe,” and other words and terms of similar meaning in connection with any discussion of
future operating or financial performance and/or sales
Senior management uses operating income excluding special items, adjusted EPS, and working
capital to assess performance and allocate resources because senior management believes that these measures are useful in
understanding current profitability levels and that current levels may serve as a base for future performance.
https://www.avient.com/sites/default/files/2020-11/investing-in-avient_0.pdf
Forward-
looking statements give current expectations or forecasts of future events and are not guarantees of future performance.
We undertake no obligation to publicly update forward-looking statements, whether as a result of new information, future events or otherwise.
FUTURE GROWTH IN EXCESS
OF GDP IS DRIVEN BY:
Our company is positioned to sustainably grow at a rate that
exceeds GDP.
https://www.avient.com/sites/default/files/2020-10/investing-in-avient.pdf
Forward-
looking statements give current expectations or forecasts of future events and are not guarantees of future performance.
We undertake no obligation to publicly update forward-looking statements, whether as a result of new information, future events or otherwise.
FUTURE GROWTH IN EXCESS
OF GDP IS DRIVEN BY:
Our company is positioned to sustainably grow at a rate that
exceeds GDP.
https://www.avient.com/sites/default/files/2023-11/AVNT November IR Presentation.pdf
Forward-looking statements give current expectations
or forecasts of future events and are not guarantees of future performance.
They use words such as "will," “anticipate,” “estimate,” “expect,” “project,” “intend,” “plan,”
“believe” and other words and terms of similar meaning in connection with any discussion of future operating or financial condition, performance and/or sales.
In particular, these include statements relating to future actions; prospective changes in raw
material costs, product pricing or product demand; future performance; estimated capital expenditures; results of current and anticipated market conditions and market strategies; sales efforts; expenses; the outcome of contingencies such as legal
proceedings and environmental liabilities; and financial results.
https://www.avient.com/sites/default/files/2021-10/avnt-q3-2021-news-release.pdf
As such, we
look forward to pursuing other acquisition opportunities and/or repurchasing Avient shares in the
open market in the future.”
Forward-looking statements give current expectations or forecasts
of future events and are not guarantees of future performance.
We undertake no obligation to publicly update forward-looking statements, whether as a result of
new information, future events or otherwise.
https://www.avient.com/sites/default/files/2024-10/Hydrocerol Chemical Foaming Agents Brochure.pdf
Weight reductions of 10 to 20% can be achieved
in injection-molded plastic components such
as interior trim parts, dashboard carriers, door
parts, glove boxes, and blow-molded parts
such as air duct systems.
The concentrates produce
an especially fine-celled foam structure that
minimizes the risk of surface defects due to
the thermoforming process.
https://www.avient.com/sites/default/files/2020-03/PolyOne_Website-12.19.pdf
Forward-looking statements give current expectations or forecasts of future events
and are not guarantees of future performance.
They
use words such as “will,” “anticipate,” “estimate,” “expect,” “project,” “intend,” “plan,” “believe,” and other words and terms of similar meaning in
connection with any discussion of future operating or financial performance and/or sales.
We undertake no obligation to publicly update forward-looking statements, whether as a result of new information, future events or otherwise.
https://www.avient.com/knowledge-base/article/overmolding-processing
Pre-heating can also reduce any surface moisture present on the substrate and thereby improve adhesion.
When using lifter bar ejection systems, differential thermal expansion of the mold may cause the lifter to jam.
SEBS formulations release from cool surfaces more easily than hot surfaces.